单词 | Backfill |
例句 | (1) After backfilling, he neatly relaid the turf. (2) We lost the topsoil that had been back-filled against the new house. (3) This article is good for promotion of backfill. (4) Engineering backfill will be applied afterwards sections as indicated in Figure 2 of this Permit. (5) Court decision defendant Mr. Wen will unearth underground backfill, restores the original condition. (6) Under the complex geological condition where the backfill is on thick soft clay, the design method of combining fly ash concrete pile and lime pile is presented. (7) Earth excavation and backfill is to have the appropriate security measures to strictly regulate the construction. (8) The upward drift stoping with backfill is a mining method with a widespread use future. (9) Slags containing Mn is used as the roadbed backfill instead of natural clay. (10) The third alternative, and the most straight forward interpretation, was that the daub was contemporary with the backfilling of the drain. (11) Inspect manage is perforative project whole process: Action, bid, coordinate schedule, budgetary final accounts, optimize a design, reduce excavate and concrete backfill, cancelled scouring sluice. (12) To cure pit collapse with residual soil from granite, what measure can be chose is to backfill with bags of sand and infiltrate steel tube or reinforce steel bar to pin up filler. (13) When steep slope-wall is used in surface mine, the road of truck-communication inner dumping can be set in the middle of pit by backfill. (14) A systematical study is made of the stability of backfill in blasting. (15) Reconstructing phase space to measured data, the intrinsic laws of deformation of different backfill were researched. (16) The squeezed transportation pump is specialized equipment used for transporting fill in backfill mining. (17) At last, some suggestions were raised for the concrete backfill mining. (18) Finally, CoMParing the field test indicators with mathematical methods of evaluation results, we evaluate quality backfill of the Dian Lian expressway. (19) Many engineering construction utilize embankment, for, abutment , retaining wall , foundation pad , base backfill and so on. (20) The results indicate that elastic modulus, the angle of internal friction, and cohesive stress of the backfill are main factors affecting the stability of the slope. |
随便看 |
|
英语例句大全共收录104207条中英例句词条,基本覆盖所有常用英文单词的例句、长难句及中文翻译,是不可多得的英语学习材料。